Skip to content
EveryLingua All languagesDictionary
EN

C2  ·  50 words

Supply chain planning in Spanish

Forecasting, stock, sourcing and resilience — the words in which flows of goods are decided.

Practise this list

From these 50 words, as many per round as you like — up to all of them: first what is due today, then new ones. First you choose, then you fill the gap, then you write it yourself. Mistakes come back again shortly.

More about this list

La red de suministro extendida es tan fuerte como su eslabón más lento: the extended supply network is only as strong as its slowest link. This one runs the other way round from most of the list: English has a single word where Spanish has three, and the Spanish speaker is the one who has to choose. El eslabón is the physical link of a chain, the ring of metal, and that is the sense this list needs — el eslabón más débil is the weakest link. El enlace is a connection between two things: a rail connection, a hyperlink on a page, the person who acts as a go-between. El vínculo is the bond that holds people or ideas together. English calls all three a « link », which is why a page translated word for word will offer you a ring of chain to click on.

The words

Phrase (50)

la red de suministro extendidathe extended supply networkPhraseC2
La red de suministro extendida es tan fuerte como su eslabón más lento.The extended supply network is only as strong as its slowest link.
el eslabón aguas arribathe upstream linkPhraseC2
El eslabón aguas arriba reacciona con retraso.The upstream link reacts with a delay.
el efecto látigothe bullwhip effectPhraseC2
El efecto látigo amplifica la variación hacia el proveedor.The bullwhip effect amplifies the variation towards the supplier.
la demanda real compartidathe shared real demandPhraseC2
La demanda real compartida es más barata que el stock.The shared real demand is cheaper than stock.
la previsión de la demandathe demand forecastPhraseC2
La previsión de la demanda siempre se equivoca; la cuestión es cuánto.The demand forecast is always wrong; the question is by how much.
el error de previsiónthe forecast errorPhraseC2
El error de previsión baja al agregar productos.The forecast error falls when products are aggregated.
la agregación de la previsiónthe aggregation of the forecastPhraseC2
La agregación de la previsión mejora la precisión y pierde detalle.The aggregation of the forecast improves accuracy and loses detail.
la estacionalidad de la demandathe seasonality of demandPhraseC2
La estacionalidad de la demanda se calcula sobre varios años.The seasonality of demand is calculated over several years.
el plazo de entrega del proveedorthe supplier's lead timePhraseC2
El plazo de entrega del proveedor varía más de lo que se promete.The supplier's lead time varies more than is promised.
la variabilidad del plazothe variability of the lead timePhraseC2
La variabilidad del plazo obliga a más stock que el plazo medio.The variability of the lead time forces more stock than the mean lead time does.
la reserva frente a la incertidumbrethe buffer against uncertaintyPhraseC2
La reserva frente a la incertidumbre cubre la variación, no la media.The buffer against uncertainty covers the variation, not the average.
el nivel de servicio objetivothe target service levelPhraseC2
El nivel de servicio objetivo del noventa y nueve por ciento cuesta el doble que el del noventa y cinco.The target service level of ninety-nine per cent costs twice as much as ninety-five.
la revisión periódica del stockthe periodic review of stockPhraseC2
La revisión periódica del stock pide siempre en la misma fecha.The periodic review of stock always orders on the same date.
el lote económico de pedidothe economic order quantityPhraseC2
El lote económico de pedido equilibra pedir y almacenar.The economic order quantity balances ordering against storing.
la cobertura de existenciasthe stock coverPhraseC2
La cobertura de existencias se expresa en días de venta.The stock cover is expressed in days of sales.
la rotación del inventariothe inventory turnoverPhraseC2
La rotación del inventario mide cuántas veces se renueva al año.The inventory turnover measures how many times a year it is renewed.
el inventario obsoletothe obsolete inventoryPhraseC2
El inventario obsoleto se reconoce tarde y se paga entero.The obsolete inventory is noticed late and paid for in full.
la clasificación por valor de consumothe classification by consumption valuePhraseC2
La clasificación por valor de consumo concentra la atención donde importa.The classification by consumption value concentrates attention where it counts.
el artículo de baja rotaciónthe slow-moving itemPhraseC2
El artículo de baja rotación necesita otra política de stock.The slow-moving item needs a different stock policy.
la ruptura de stockthe stockoutPhraseC2
La ruptura de stock cuesta más de lo que muestra la contabilidad.The stockout costs more than the accounts will show.
la venta perdidathe lost salePhraseC2
La venta perdida no aparece en ningún sistema.The lost sale appears in no system at all.
el pedido pendiente de servirthe order waiting to be filledPhraseC2
El pedido pendiente de servir se prioriza por cliente.The order waiting to be filled is prioritised by customer.
el aplazamiento de la personalizaciónthe postponement of customisationPhraseC2
El aplazamiento de la personalización reduce el número de referencias.The postponement of customisation reduces the number of item codes.
el punto de desacoplamientothe decoupling pointPhraseC2
El punto de desacoplamiento separa lo que se hace contra pedido.The decoupling point separates what is made against an order.
la fabricación contra pedidomake-to-order manufacturingPhraseC2
La fabricación contra pedido cambia stock por plazo.Make-to-order manufacturing trades stock for lead time.
la planificación de necesidades de materialmaterial requirements planningPhraseC2
La planificación de necesidades de material explota la lista de materiales.Material requirements planning explodes the bill of materials.
la lista de materialesthe bill of materialsPhraseC2
La lista de materiales tiene que estar limpia o nada funciona.The bill of materials has to be clean or nothing works.
el plan maestro de producciónthe master production schedulePhraseC2
El plan maestro de producción se congela unas semanas antes.The master production schedule is frozen some weeks in advance.
el horizonte congeladothe frozen horizonPhraseC2
El horizonte congelado protege a la fábrica del cambio diario.The frozen horizon protects the factory from daily change.
la capacidad finita en la planificaciónfinite capacity in planningPhraseC2
La capacidad finita en la planificación evita planes imposibles.Finite capacity in planning prevents impossible plans.
el proceso de planificación integradathe integrated planning processPhraseC2
El proceso de planificación integrada reúne ventas y operaciones.The integrated planning process brings sales and operations together.
el abastecimiento estratégicostrategic sourcingPhraseC2
El abastecimiento estratégico mira más allá del precio.Strategic sourcing looks beyond the price.
la evaluación continua del proveedorthe continuous evaluation of the supplierPhraseC2
La evaluación continua del proveedor puntúa plazo, calidad y respuesta.The continuous evaluation of the supplier scores lead time, quality and response.
la dependencia de proveedor únicothe dependence on a single supplierPhraseC2
La dependencia de proveedor único se acepta a sabiendas o no se acepta.The dependence on a single supplier is accepted knowingly or not at all.
la segunda fuente de suministrothe second source of supplyPhraseC2
La segunda fuente de suministro cuesta y se usa poco.The second source of supply costs money and is seldom used.
el acuerdo marco de comprathe framework purchase agreementPhraseC2
El acuerdo marco de compra fija condiciones sin comprometer volumen.The framework purchase agreement fixes terms without committing volume.
el coste oculto del suministro lejanothe hidden cost of distant sourcingPhraseC2
El coste oculto del suministro lejano aparece en el inventario en tránsito.The hidden cost of distant sourcing shows up in the stock in transit.
la visibilidad de la cadenathe visibility of the chainPhraseC2
La visibilidad de la cadena termina en el segundo nivel.The visibility of the chain ends at the second tier.
el proveedor de segundo nivelthe second-tier supplierPhraseC2
El proveedor de segundo nivel es donde suele estar el riesgo.The second-tier supplier is usually where the risk sits.
el mapeo del riesgo de suministrothe mapping of supply riskPhraseC2
El mapeo del riesgo de suministro se actualiza cada año.The mapping of supply risk is updated every year.
la resiliencia de la cadenathe resilience of the chainPhraseC2
La resiliencia de la cadena cuesta eficiencia y se paga en la crisis.The resilience of the chain costs efficiency and pays in the crisis.
el plan de continuidad del suministrothe supply continuity planPhraseC2
El plan de continuidad del suministro se prueba, no se archiva.The supply continuity plan is tested, not filed.
el tiempo de recuperación tras la interrupciónthe recovery time after an interruptionPhraseC2
El tiempo de recuperación tras la interrupción es la medida real del riesgo.The recovery time after an interruption is the real measure of the risk.
la nacionalización del abastecimientothe reshoring of supplyPhraseC2
La nacionalización del abastecimiento acorta el plazo y sube el coste.The reshoring of supply shortens the lead time and raises the cost.
el flujo de retorno del productothe return flow of the productPhraseC2
El flujo de retorno del producto cuesta más por unidad que el directo.The return flow of the product costs more per unit than the outward one.
la gestión de devolucionesthe management of returnsPhraseC2
La gestión de devoluciones decide el margen del comercio electrónico.The management of returns decides the margin in online retail.
el cumplimiento del pedido perfectothe perfect order fulfilmentPhraseC2
El cumplimiento del pedido perfecto exige acertar en todo a la vez.The perfect order fulfilment requires getting everything right at once.
la entrega a tiempo y completathe on-time and in-full deliveryPhraseC2
La entrega a tiempo y completa se mide contra la fecha prometida al principio.The on-time and in-full delivery is measured against the date promised at the start.
la diligencia debida en la cadenathe due diligence in the chainPhraseC2
La diligencia debida en la cadena alcanza a los derechos laborales.The due diligence in the chain extends to labour rights.
la huella logística del productothe logistical footprint of the productPhraseC2
La huella logística del producto depende del modo de transporte.The logistical footprint of the product depends on the mode of transport.

Back to the quiz ↑

This list belongs to Work and jobs — 24 lists and 1 155 words that can also be practised as a whole.

Hear and recognise these words in the listening trainer