C1 · 42 words
Running a building site
Trades, delays and variations — the words spoken and written on a German building site.
If you already know die Behinderung, you know it as disability, and that is how ordinary German uses it. On a building site the same noun means something else entirely: anything that stops a contractor working as planned — drawings that have not arrived, a previous trade that has not finished, an access road closed to deliveries. The verb behind it, behindern, simply means to obstruct, and the site has kept that plain sense. It matters because the obstruction has to be put in writing. Die Behinderungsanzeige is the contractor’s notice that the work is being held up and why; sent promptly, it is the basis for eine Bauzeitverlängerung and sometimes for Mehrkosten, and without it a delay usually stays the contractor’s own problem. So a site manager who says wir werden behindert is not talking about anybody’s health. He is opening a claim.
The words
Verb (4)
ausschalento strike (formwork)VerbC2
Separable, regular: schalt aus, ausgeschalt. Not ausschalten, to switch off.
betonierento pour concreteVerbC1
Participle without ge-: betoniert.
einweisento induct, to brief (on site)VerbC1
Separable, irregular: wies ein, eingewiesen. Also ins Krankenhaus einweisen, to admit to hospital.
nachbessernto remedy, to put rightVerbC1
Separable: bessert nach, nachgebessert.
This list belongs to Home and the building — 18 lists and 670 words that can also be practised as a whole.
Practise this list
Multiple choice and gaps, drawn from exactly these 42 words. Whatever you get wrong comes back tomorrow.